Please ensure Javascript is enabled for purposes of website accessibility TOPS Docket Gold Project Planner, 1 Subject, Project-Management Format, Narrow Rule, Bronze Poly Cover, 8.5 x 6.75, 70 Sheets (63826) | OfficeCrave.com
Back to Shop
Shop By Category
TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)

TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)

TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)

This item TOP63826 has been replaced with TOP63754
TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)
TOPS Docket Gold Project Planner, 1-Subject, Project-Management Format with Narrow Rule, Bronze Cover, (70) 8.5 x 6.75 Sheets (63826)
Bulk Discounts
Bulk
Discounts
1-2 Day Shipping
1-2 Day
Shipping
Easy Returns
Easy
Returns
Made in USA
Made
in USA
AutoShip Eligible
AutoShip
Eligible
Google Trusted Store
Google
Trusted
Secure Checkout
Secure
Checkout
Satisfaction Guaranteed
Satisfaction
Guaranteed

Product Details

View More +
Recommended Replacement
Bulk Discounts
Bulk
Discounts
1-2 Day Shipping
1-2 Day
Shipping
Easy Returns
Easy
Returns
Made in USA
Made
in USA
AutoShip Eligible
AutoShip
Eligible
Google Trusted Store
Google
Trusted
Secure Checkout
Secure
Checkout
Satisfaction Guaranteed
Satisfaction
Guaranteed

Product Details

  • Special note taking ruling features sections for prioritizing actions, comments and notes.

  • Numbered line format, front and back.

  • Heavyweight chipboard back.

  • Letr-Trim perforation for clean tear-out.

  • Coil-lock wire binding.

  • Shop TOPS Products

Customers Also Purchased

Product Description

Special note-taking ruling features sections for prioritizing actions, comments and notes. Numbered-line format, front and back. Heavyweight back cover. Letr-Trim perforation for clean tear-out. Coil-lock wire binding. Project PlannerWater- and rip-proof poly cover. Pocket-Sized Indicator: N; Book-Binding Type: Spiral Coil; Book-Binding Details: Coil-Lock: Flexible Cover; Book-Binding Edge: Side.

Product Specs

Manufacturer

MPN

TOP63826

Model#

63826

UPC Code

025932638268

UNSPSC Code

1

Cover Color

Bronze

Dated/Undated

Undated

Number of Pockets

0

Post-Consumer Recycled Content Percent

0%

Pre-Consumer Recycled Content Percent

0%

Sheet Color

White

Special Features

Project PlannerWater- and rip-proof poly cover.

Total Recycled Content Percent

0%

Color Family

Bronze

Sheet Basis Weight (lb)

15 lb Bond

Sheet Ruling Size

1/4"

Pocket-Sized Indicator

N

Number of Subjects/Sections

1

Number of Section Dividers

0

Sheet Size (Bound-Side First)

8.5 x 6.75

Sheet Rule/Format Type

Project-Management Format; Narrow Rule

Sheet Perforation Details

Micro-Perforation

Back-Cover Material

Chipboard

Sheet-Ruling Color

Blue

Sheet Rule/Format Details

Project Planner Elements

Front-Cover Material

Poly

Book-Binding Type

Spiral Coil

Book-Binding Edge

Side

Book-Spine Length

8.5"

Book Width

6.75"

Sheets per Book/Journal

70

Book-Binding Details

Coil-Lock: Flexible Cover

Assembly Required

No assembly is required

Contains Recycled Materials

N

Green Product

N

Unit of Measure

Each

Item Weight

0.5

Ships via UPS

Y

Carton Pack Quantity

12 Each

This item is sold by the

Each

GTIN Item

025932638268

UPC Retail

025932638268

UPC Carton

50025932638263

Brand

TOPS

Manufacturer Stock No.

63826

Country of Origin

US

UNSPSC Number

14111514

Questions & Answers (0)

There are no questions for this product.

Reviews

(0 reviews)

5 star0%
4 star0%
3 star0%
2 star0%
1 star0%


Logitech

Top Trending Products

Officecrave.com is a leading provider of office supplies including technology products, maintenance supplies, furniture and more. We strive to provide businesses with the most affordable price on the highest-quality items and the TOPS Docket Gold Project Planner, 1 Subject, Project-Management Format, Narrow Rule, Bronze Poly Cover, 8.5 x 6.75, 70 Sheets (63826) is no exception.

We work with customers from all industries, including schools, government, medical, accounting, corporate, educational, healthcare, finance, military and private industry.

All products on OfficeCrave.com including the TOPS Docket Gold Project Planner, 1 Subject, Project-Management Format, Narrow Rule, Bronze Poly Cover, 8.5 x 6.75, 70 Sheets (63826) are manufactured under ISO 9001 Quality Standards. We also keep a full line of TAA compliant products. Being green is an important part of our business and we are meeting all Green Compliance Standards.

}